Solyndra's $733M Plant Had Robots, Spa ShowersBy Alison Vekshin and Mark ChediakBloomberg Sep. 29, 2011 |
House Passes NDAA With Section 219 Aimed at 'Merging' U.S. and Israeli Militaries
Netanyahu Confirms Plan to 'Merge' U.S. and Israeli Militaries
Sen. Lindsey Graham Dead at 71
Sen. Graham Worked With Israeli Officials to Push GOP Senators to Pass Aid Package, Amb. Reveals
Israel Told Trump of 'Iranian Assassination Plot' Before He Declared MoU 'Over,' Report Suggests
![]() The glass-and-metal building that Solyndra LLC began erecting alongside Interstate 880 in Fremont, California, in September 2009 was something the Silicon Valley area hadn’t seen in years: a new factory. It wasn’t just any factory. When it was completed at an estimated cost of $733 million, including proceeds from a $535 million U.S. loan guarantee, it covered 300,000 square feet, the equivalent of five football fields. It had robots that whistled Disney tunes, spa-like showers with liquid-crystal displays of the water temperature, and glass-walled conference rooms. “The new building is like the Taj Mahal,” John Pierce, 54, a San Jose resident who worked as a facilities manager at Solyndra, said in an interview. The building, designed to make far more solar panels than Solyndra got orders for, is now shuttered, and U.S. taxpayers may be stuck with it. Solyndra filed for bankruptcy protection on Sept. 6, leaving in its wake investigations by Congress and the Federal Bureau of Investigation and a Republican-fueled political embarrassment for the Obama administration, which issued the loan guarantee. About 1,100 workers lost their jobs. Amid the still-unfolding postmortems, the factory stands as emblematic of money misspent and the Field of Dreams ethos that seemed to drive the venture, said Ramesh Misra, a solar-industry analyst in Los Angeles for Brigantine Advisors. ,a href='http://www.bloomberg.com/news/2011-09-28/solyndra-s-733-million-plant-had-whistling-robots-spa-showers.html'>Read More |